Facility Management Software: building files with enaio
Facility management software based on enaio stores all documents on sites, buildings, rooms and assets in a digital building file, monitors maintenance and inspection deadlines and assigns contracts, service providers and costs to the right property.
AWP Consult implements this as a certified enaio partner. Your specialist building management application stays in place, while enaio takes care of documents, deadlines and audit-proof storage. This lets you prove that you meet your operator responsibility, from the floor plan to the lift inspection certificate.
- Site
- Building
- Plant room
- Lift
-
Inspection certificateapproved inspection bodyfiled
-
Maintenance contractlinked to service provideractive
-
Defect reporttracked until rectifiedin progress
Key facts at a glance
- Facility management software with document management is a system that brings together all documents on sites, buildings, rooms and technical assets in a digital building file and links deadlines, contracts, service providers and workflows to them.
- According to the German standard DIN 32736, building management is divided into technical, infrastructural and commercial building management. All three areas generate documents that belong in the same building file.
- Under Annex 2 Section 2 of the German Ordinance on Industrial Safety and Health (BetrSichV), lift installations must be inspected by an approved inspection body. The inspection interval must not exceed two years, and an interim inspection is due halfway through the inspection period.
- Under Section 14(7) of the German Ordinance on Industrial Safety and Health (BetrSichV), inspection records must be kept at least until the next inspection, and for installations subject to monitoring under Section 17 BetrSichV for their entire period of use. Both provisions permit electronic form.
- If parts of a building become detached, the possessor of the land is liable under Section 836 of the German Civil Code (BGB), unless they exercised the care required in ordinary dealings. In practice, this care can only be proven with documented inspection and maintenance.
- AWP Consult connects enaio with specialist applications such as GEBman and San_Reno and uses contract management to allocate costs from framework agreements to individual properties.
What is facility management software with document management?
Facility management software with document management manages not only spaces, assets and work orders but also all the related documents: plans, inspection reports, maintenance logs, contracts, invoices and correspondence, each filed with the right property, given deadlines and archived in an audit-proof way. This turns the software into proof that buildings and assets are operated properly.
According to the German standard DIN 32736 (Building management: terms and services), building management covers three service areas: technical building management with operation, servicing and maintenance of assets, infrastructural building management with services such as cleaning, security and caretaking, and commercial building management with contracts, costs and billing. Each of these areas generates documents, and that is exactly where enaio comes in.
Facility management software
The umbrella term for software that companies, public administrations and service providers use to manage their buildings, spaces and assets. Depending on the vendor, the focus is on space, on maintenance or on documents and deadlines.
CAFM system
Computer-Aided Facility Management refers to specialist applications that manage the property structure, rooms, assets, work orders and maintenance planning. Documents are often only attached to the record there, without archive, versioning or retention rules.
Building management software
This usually refers to technical operations: assets, maintenance, faults and inspections. For this part, the building file with deadlines and inspection records is particularly important, because this is where operator responsibility is decided.
Building administration software
The term often refers to the commercial management of rental properties with leases and service charges. There are dedicated modules for this, such as the digital tenant file and the archiving of service charge statements.
We work with you to clarify which tasks stay with your specialist application and which documents, deadlines and workflows belong in the digital building file with enaio.
How is a digital building file structured?
A digital building file follows the property structure of site, building, floor, room and asset, and each level holds exactly the documents that belong there: site plans at the site, building permit and floor plans at the building, the room schedule at the floor and inspection reports at the individual asset. In the real estate industry it is often called a property file; find out more on our page about the digital property file.
In enaio, the building file captures the spatial conditions, characteristics and technical details of a building. It also includes key consumables, responsible service providers and contacts. Documents that are no longer used in day-to-day business move to the archive automatically and in an audit-proof way, so they do not burden the specialist application.
| Level | Typical documents | Metadata (example) |
|---|---|---|
| Site | Land register extract, site plans, utility connections, insurance documents | Site ID, address, owner |
| Building | Building permit, floor plans and sections, fire safety concept, energy performance certificate, as-built documentation | Building ID, year of construction, type of use |
| Floor and room | Room schedule, floor area schedule, escape and rescue plans, furnishings | Room number, area, use, cost centre |
| Asset | Manufacturer documentation, operating instructions, inspection certificates, maintenance logs, defect reports | Asset ID, inspection requirement, interval, next due date |
| Contract and service provider | Maintenance and framework agreements, specifications of services, service provider records | Contractual partner, term, notice period, assigned properties |
| Process | Fault reports, work orders, quotations, acceptance records, invoices | Status, trade, property reference |
Example structure. We define levels, document types and metadata together with your facility management team during the analysis. Our article on metadata in a DMS explains how metadata drives search.
Do you have a specific question about your case?
Which inspection records belong in the building file?
The building file should contain all records of inspections and maintenance that are required or contractually agreed for safe operation, above all inspection certificates for lifts and other installations subject to monitoring, test reports for electrical installations, records for fire safety systems and maintenance logs in line with manufacturer specifications. The overview shows typical examples with their basis.
| Asset or work equipment | Basis | Deadline | Record in the file |
|---|---|---|---|
| Lift installations | BetrSichV, Annex 2 Section 2 | Main inspection by an approved inspection body at least every two years, interim inspection halfway through the period | Inspection certificate, defect report, maintenance logs |
| Work equipment in general | Section 3(6) BetrSichV | set by the employer so that work can continue safely until the next inspection | Inspection record under Section 14(7) BetrSichV |
| Electrical installations and equipment | DGUV Regulation 3 | regular repeat inspections, guide values in the implementation instructions | Test reports, defects and their rectification |
| Safety systems for fire protection | Building regulations of the German federal states (Länder), such as inspection ordinances for technical installations | according to state law and building permit | Expert inspection reports, fire safety concept, maintenance records |
| Building services with maintenance contract | Manufacturer specifications and maintenance contract | according to maintenance plan or contract | Maintenance logs, proof of service, invoices |
Not legal advice. Which inspections apply to your assets depends on the risk assessment, manufacturer specifications, building permit and state law. enaio then monitors the defined deadlines automatically.
We will show you what this looks like with enaio in your organisation.
Book an appointment +49 6104 94738-13How does facility management software monitor maintenance and inspection deadlines?
Facility management software monitors maintenance and inspection deadlines by storing every asset subject to inspection in the building file with its legal basis, interval and last inspection. The system sends a follow-up reminder to the responsible person before the due date and only recalculates the deadline once the inspection report is available. The best-known example is lifts, whose main inspections may be no more than two years apart. Like any other process, this is controlled via workflow management in enaio.
01
Record the asset and its inspection duty
Each asset receives a unique ID, a place in the property structure and its inspection requirements. This is based on an inspection catalogue derived from ordinances, accident prevention regulations, manufacturer specifications and your risk assessment.
02
Set interval and start date
For each inspection, you define how often it takes place and from which event the deadline runs, for example from the last inspection or commissioning. Where the ordinance does not specify a deadline, the employer sets it under Section 3(6) of the German Ordinance on Industrial Safety and Health (BetrSichV).
03
Reminder before the due date
enaio reminds property managers of the upcoming inspection in good time. If the task is left undone, the workflow escalates to the next level instead of letting the deadline pass unnoticed.
04
Order to the service provider
The building file immediately shows which service provider is responsible under which contract and who the contact person is there. Ordering and scheduling are documented at the property.
05
File the inspection report, track defects
Inspection certificates or maintenance logs are added directly to the asset via upload, email or scan. Defects found are created as tasks with a deadline and tracked until they are rectified.
06
Calculate the new deadline
The system only calculates the next due date once the proof is available. This way, the file always shows which inspections are completed, open or overdue.
In a consultation, we clarify which assets in your properties require inspection and how the deadlines can be mapped in enaio.
Book a consultationWhat does operator responsibility require of documentation?
Operator responsibility requires owners and operators to be able to prove at any time that buildings and assets are operated safely: who is responsible, which inspections were due, who carried them out, which defects were found and when they were rectified. The GEFMA 190 guideline of the German Facility Management Association on operator responsibility in facility management describes this responsibility for structures including building services and outdoor facilities. The following sections show what this means for the building file. They do not replace legal advice.
01
Liability and proof of due care
Operator responsibility does not derive from a single law but from many duties: duty of care for public safety, occupational health and safety, operational safety, fire protection and environmental law. What they have in common is that in the event of damage, what counts is not good intentions but proof.
One example is Section 836 of the German Civil Code (BGB). If a structure collapses or parts of it become detached, the possessor of the land is liable for the consequences if they result from faulty construction or inadequate maintenance. The obligation to compensate does not apply if the possessor exercised the care required in ordinary dealings. This care can only be proven through documented site walks, inspections and maintenance.
- Who responsible person or commissioned service provider, with proof of the assignment
- Whattype and scope of the inspection or maintenance on a clearly identified asset
- Whendate performed and next due date
- Result defects found, measures taken and date of rectification
Also document site walks without findings. In a dispute, a report with no defects is just as valuable as one with a list of defects.
02
Inspection duties under the German BetrSichV and DGUV Regulation 3
The German Ordinance on Industrial Safety and Health (BetrSichV) requires employers to determine and define the type and scope of necessary inspections of work equipment and the intervals for them, unless the ordinance itself specifies them (Section 3(6) BetrSichV). The intervals must be set so that the work equipment can be used safely until the next inspection. For installations subject to monitoring such as lifts, Annex 2 contains its own requirements.
For electrical installations and equipment, the accident prevention regulation DGUV Regulation 3 of the German Social Accident Insurance requires regular repeat inspections. Its implementation instructions give guide values from which the employer may deviate on their own responsibility if the same level of safety is achieved.
Under Section 17 of the German Ordinance on Industrial Safety and Health (BetrSichV), the documents for installations subject to monitoring must be available at the place of operation and presented to the authority on request. If the building file is accessible in the browser and on mobile devices, they can be called up directly at the asset instead of keeping binders in the plant room.
- RecordUnder Section 14(7) BetrSichV, with the type, scope and result of the inspection plus the name and signature of the inspector.
- Retention at least until the next inspection, and for installations subject to monitoring under Section 17 BetrSichV for the entire period of use.
- ElectronicBoth provisions expressly permit retention in electronic form.
Store the legal basis for each deadline as metadata. If a regulation changes, you will find all affected assets with a single search.
03
Lifts as an example: main and interim inspection
Under Annex 2 Section 2 of the German Ordinance on Industrial Safety and Health (BetrSichV), lift installations must be inspected regularly by an approved inspection body. The inspection interval must not exceed two years. Halfway through the period between two main inspections, an additional interim inspection must be carried out, also by an approved inspection body.
For each lift installation, the building file therefore manages several deadlines side by side: the next main inspection, the interim inspection halfway through the period and maintenance according to manufacturer specifications and the maintenance contract. On top of this come defects from the inspection, which remain open until they are rectified.
Set up the main and interim inspections as separate deadlines that depend on the same start date. If the main inspection is moved, the interim inspection is recalculated automatically.
04
Delegating duties to individuals and service providers
Operator duties can be delegated but not entirely handed over. Under Section 13(2) of the German Occupational Safety and Health Act (ArbSchG), the employer can commission reliable and competent persons in writing to perform the employer's tasks on their own responsibility. If maintenance and inspection are outsourced to external service providers, the client remains obliged to select them carefully, instruct them clearly and supervise the work.
- Written assignments and delegations of duties are filed as a separate document type with the person and property, with validity period and follow-up reminder.
- Service providers' qualification records, certificates and proof of insurance are filed with an expiry date and requested again in good time.
- Spot checks and acceptance of the service are documented at the property as proof of supervision.
For every delegation of duties, check whether the assigned person also has access to the necessary documents. Responsibility without access to inspection reports and contracts achieves nothing.
05
Documenting maintenance properly under DIN 31051
The German standard DIN 31051 (Fundamentals of maintenance) distinguishes four basic measures: servicing, inspection, repair and improvement. For the building file, it is worth adopting this classification as document types. The file then shows at a glance whether an asset has only been serviced as planned or has already been repaired several times.
Our article on maintenance management in a DMS describes how maintenance orders for property portfolios run digitally.
- Servicing scheduled care according to manufacturer specifications and maintenance contract, documented by the maintenance log
- InspectionDetermining the actual condition during site walks and inspections, documented by the inspection report
- RepairRestoring function after a fault or defect, documented by work order, report and invoice
- ImprovementChanges for greater reliability or safety, documented by quotation, acceptance and updated asset documentation
Link invoices from maintenance companies to the asset, not just to the supplier account. Later, this shows you which assets are repaired unusually often.
06
Retention: what stays in the building file and for how long
There is no uniform retention period for the building file. Construction and as-built documents are usually needed for as long as the building stands. Under Section 14(7) of the German Ordinance on Industrial Safety and Health (BetrSichV), inspection records must be kept at least until the next inspection, and for installations subject to monitoring under Section 17 BetrSichV for the entire period of use. As accounting vouchers, service provider invoices must generally be kept for eight years under Section 147 of the German Fiscal Code (AO), commercial and business letters for six years.
In enaio, retention is tied to the document type. When an asset is decommissioned, this date starts the remaining retention periods of its documents. The archive is subject to the same requirements as any archiving software, and invoices belong in a GoBD-compliant DMS in line with the German principles for proper electronic bookkeeping.
Do not delete inspection reports automatically after the follow-up inspection as long as defects from them are still open. The history across several inspections shows whether defects recur.
We go through the inspection duties, responsibilities and records of your assets with you and show how enaio tracks deadlines and defects until they are rectified.
- Inspection catalogue with legal basis
- Deadlines with responsible role
- Defects tracked until rectified
How are contracts and service providers managed in facility management?
Contracts and service providers are managed by recording every maintenance, cleaning or framework agreement in enaio with its term, notice period and scope of services and assigning it to exactly the properties and assets it applies to. This makes deadlines, contacts and costs visible directly at the building. Combined with enaio contract management, costs from framework agreements can be allocated to individual properties.
Our page on contract administration describes how terms and notice dates are managed in general.
Framework agreements by property
A framework agreement often applies to many buildings. In enaio, it is filed once and linked to all affected properties and assets. Term, notice period and specification of services are stored with the contract, and follow-up reminders alert you in good time.
enaio contract managementService providers and contacts
For each property, the file records which service provider is responsible for which trade and who is responsible internally. When a fault occurs, nobody has to search for long.
Costs per property
Service provider invoices run through the incoming invoice workflow and are assigned to the contract and property. This way, the building file shows what the operation and maintenance of a building actually cost.
Service provider records
Service providers upload inspection reports, certificates and proof of insurance directly to the right file via the AWP Link and Upload Portal instead of sending them unencrypted by email.
Consumables and orders
Key consumables are recorded per property. As a next step, central purchasing can be built on this, with approval in the workflow.
Change of service provider
If the contractual partner changes, the asset documentation, inspection history and open defects remain complete in your file and not with the previous service provider.
Not sure where to start? We will assess your starting position.
How does facility management software work with CAFM systems?
Facility management software based on enaio works with CAFM systems through a division of labour: the specialist application manages the property structure, spaces, assets and work orders, enaio takes care of documents, audit-proof archiving, deadlines and approval workflows, and interfaces connect the two so that nobody maintains data twice. AWP Consult connects enaio to specialist applications including GEBman and San_Reno.
Central archiving in the building file relieves the specialist application. Documents that would only be attachments there are indexed, versioned and findable via full-text search in enaio. We connect further systems via the enaio interfaces, for example ERP systems such as SAP, Microsoft Dynamics 365 or DATEV for invoices and cost centres.
Sites, buildings, rooms and assets come from the specialist application.
Quotations, reports and emails from service providers are filed in the building file directly from Office and Outlook.
With the enaio webclient, property managers and technical staff can access plans and inspection reports on site too.
Paper files and plans are captured with enaio capture, indexed and assigned to the right level.
How is facility management software with enaio implemented?
Facility management software with enaio is implemented in five phases: an inventory of properties, assets and documents; a concept with filing plan, inspection catalogue and permissions; a pilot building with real deadlines and service providers; the rollout to further sites; and ongoing optimisation. This way, your facility management keeps working during the project, and all rules are tested on a real building.
01
Inventory
We record sites, buildings, assets, existing filing systems, contracts and specialist applications and clarify which system leads the property structure.
02
Concept
The filing plan, document types, metadata, inspection catalogue, roles and permissions are defined and signed off by you.
03
Pilot building
One building starts with real deadlines, service providers and documents. Existing records are scanned and assigned.
04
Rollout
Further sites follow. Property managers, technical staff and administration are trained.
05
Optimisation
After go-live, we analyse open deadlines, defects and processing times and refine rules and workflows.
More on this: enaio implementation and training and migrating legacy data
What mistakes happen in document management for facility management?
The most common mistakes in document management for facility management are filing by service provider instead of by property, deadlines without a responsible person, inspection intervals without a basis, property data maintained twice, inspection reports without defect tracking and legacy records scanned without review. None of these mistakes is a software problem. All of them can be avoided at the concept stage.
01
Filing by service provider instead of by property
- Impact
- When the service provider changes, an asset's history is spread across folders or lost with the contractual partner.
- Better
- File every document with the property and asset first, with service provider and contract as additional metadata.
02
Deadlines without a responsible person
- Impact
- Reminders go to shared mailboxes, nobody feels responsible and the deadline expires.
- Better
- Assign every deadline to a named role, with a deputy and escalation to the next level.
03
Inspection intervals without a basis
- Impact
- After damage or an enquiry from the authorities, nobody can explain why this particular interval applies.
- Better
- Store the legal basis, manufacturer specification or risk assessment as metadata with the deadline.
04
Property data maintained twice
- Impact
- Room numbers and asset IDs differ between the specialist application and the filing system, and documents end up with the wrong property.
- Better
- Define one leading system for the property structure and take its data over via an interface.
05
Inspection report filed, defect forgotten
- Impact
- The report is correctly filed, but the defect found is never rectified.
- Better
- Create defects as separate tasks with a deadline and only close them with proof of rectification.
06
Scanning legacy records without review
- Impact
- High effort for outdated plans and documents on assets decommissioned long ago.
- Better
- Review existing records first, mark valid as-built drawings and only take over what is needed or must be retained.
Does this sound right for your company? Let's talk about it.
Request a consultation +49 6104 94738-13Checklist: is your building documentation ready for digitalisation?
Use these questions before the project to check where your building documentation stands today. The more points are open, the more worthwhile a structured start with a pilot building becomes.
Properties and assets
- Sites, buildings and rooms are clearly identified
- Assets subject to inspection are fully recorded
- A leading system for the property structure has been defined
- Valid as-built drawings are marked as such
Deadlines and responsibility
- An inspection catalogue with legal basis and interval is in place
- A responsible role is named for every deadline
- Deputies and escalation are defined
- Delegations of duties are documented in writing
Contracts and service providers
- Maintenance and framework agreements are recorded with term and notice period
- Every contract is assigned to the properties concerned
- Contacts per trade and property are stored
- Service provider records have an expiry date
Frequently asked questions about facility management software
Your question about the digital building file is not listed? Call or write to us, and we will answer personally.
We discuss your sites, inspection duties and specialist applications and show you what the building file with enaio looks like in your organisation.
Book a call +49 6104 94738-13What is facility management software?
Facility management software supports the management of buildings, spaces and assets. With document management, it also stores all documents in a digital building file, monitors maintenance and inspection deadlines and assigns contracts, service providers and costs to the properties. AWP Consult implements this with enaio.
What does a document management system do for facility management?
A document management system handles filing, versioning, audit-proof archiving, permissions and deadlines for all documents relating to buildings and assets. Plans, inspection reports, maintenance logs, contracts and invoices are stored with the right property and can be found via full text and metadata. Workflows control follow-up reminders, approvals and defect tracking. The specialist application remains responsible for spaces and work orders.
Is building administration software the same as facility management software?
Not quite. Building administration often refers to the commercial management of rental properties, meaning leases, tenant correspondence and service charges. Facility management also covers technical and infrastructural operations with assets, maintenance and service providers. In enaio, both views can be mapped in the same property structure.
Do I need a DMS in addition to the CAFM system?
If your CAFM system only stores documents as attachments, yes. A DMS such as enaio adds audit-proof archiving, retention rules, versioning, full-text search and workflows. The property structure comes from the CAFM system via an interface, so nobody maintains data twice. AWP Consult has implemented such integrations with GEBman and San_Reno, for example.
Which inspection intervals apply to lifts?
Under Annex 2 Section 2 of the German Ordinance on Industrial Safety and Health (BetrSichV), lift installations must be inspected regularly by an approved inspection body. The inspection interval must not exceed two years. An interim inspection is due halfway through the period, also by an approved inspection body. In addition, maintenance is carried out according to manufacturer specifications and the maintenance contract.
How long must inspection reports be kept?
Under Section 14(7) of the German Ordinance on Industrial Safety and Health (BetrSichV), inspection records for work equipment must be kept at least until the next inspection. For installations subject to monitoring such as lifts, Section 17 BetrSichV requires retention for the entire period of use. In enaio, the retention period is tied to the document type.
May inspection records be kept in electronic form only?
Yes. Section 14(7) and Section 17(1) of the German Ordinance on Industrial Safety and Health (BetrSichV) expressly permit retention in electronic form. For documents transmitted exclusively electronically, an electronic signature replaces the handwritten signature. What matters is that the documents are unaltered, complete and accessible at the place of operation.
How does a digital building file help with operator responsibility?
It makes it traceable who is responsible for what, which inspections were due when, who carried them out and which defects were rectified when. Delegations of duties, contracts and service provider records are stored with the property. In the event of damage or an enquiry from the authorities, this lets you prove that the required care was taken.
Can facility management software be connected to the ERP system?
Yes. enaio is connected via interfaces to ERP systems such as SAP, Microsoft Dynamics 365 or DATEV. Service provider invoices run through the incoming invoice workflow, are assigned to the contract and property and passed to the ERP as a posting. This produces costs per property without vouchers being recorded twice.
How do I choose the right facility management software provider?
First clarify what the software should do: spaces and work orders, documents and deadlines, or both. Then check interfaces to your existing systems, audit-proof archiving, permissions, mobile use and the partner's experience with implementation and operation. A pilot building with real deadlines shows faster than any presentation whether the solution fits.
How do existing plans and paper files get into the building file?
Existing documents are scanned, indexed and assigned to the right level of the property structure. A review beforehand is worthwhile: valid as-built drawings are marked, and documents on decommissioned assets are checked for retention obligations. Many operators start with a pilot building and digitise further buildings step by step.
Which facility management terms should you know?
The most important terms that come up again and again in projects between property management, technical staff, purchasing and IT.
- Facility management
- All services used to manage buildings, assets and facilities so that they support the core business. The international management system standard for this is ISO 41001.
- Building management
- According to DIN 32736, the totality of technical, infrastructural and commercial services for the operation and management of buildings.
- CAFM
- Computer-Aided Facility Management. Specialist applications for spaces, rooms, assets, work orders and maintenance planning.
- Digital building file
- Electronic collection of all documents on a building, structured by property structure and document types, with deadlines and permissions. Also called a property file.
- Operator responsibility
- The duty of owners and operators to run buildings and assets in a way that endangers nobody, and to be able to prove this. GEFMA 190 describes it for facility management.
- Delegation of duties
- Written delegation of operator tasks to reliable, competent persons, for example under Section 13(2) of the German Occupational Safety and Health Act (ArbSchG). Selection, instruction and supervision remain with the person delegating.
- Approved inspection body
- Body that inspects installations subject to monitoring, such as lifts, under the German Ordinance on Industrial Safety and Health, abbreviated in German as ZÜS.
- Inspection catalogue
- Register of all assets subject to inspection with legal basis, inspection type, interval and responsible person.
- Maintenance
- According to DIN 31051, the combination of the four basic measures of servicing, inspection, repair and improvement.
One building with real deadlines, service providers and documents shows how the building file works for you. We plan the pilot together with your facility management team.
Further topics
Sources and legal basis
The legal and normative statements on this page are based on these official and established sources. Reviewed: October 2026.
- Annex 2 BetrSichV (German Ordinance on Industrial Safety and Health): inspection rules for installations subject to monitoring Section 2 on lift installations, main and interim inspection
- Section 14 BetrSichV: inspection of work equipment Recording and retention of inspection results in subsection 7
- Section 17 BetrSichV: inspection records and certificates Retention for the entire period of use
- Section 13 ArbSchG (German Occupational Safety and Health Act): responsible persons Written assignment under subsection 2
- Section 836 BGB (German Civil Code): liability of the possessor of land Liability if a building collapses or parts become detached
- Section 147 AO (German Fiscal Code): rules on the retention of records Retention periods of ten, eight and six years
- GEFMA 190 at DIN Media Operator responsibility 2.0 in facility management, 2023 edition
- DIN 31051 at DIN Media Fundamentals of maintenance, 2019 edition
Your building file, set up properly once
In the consultation, we record your properties, assets, inspection duties and specialist applications and show you what the digital building file with enaio looks like in your organisation. You receive a concrete recommendation for the filing plan, deadlines, interfaces and pilot building.
- In person in Dietzenbach or online
- With property management, technical staff and administration
- Result: a clear next step