enaio costs: what makes up an ECM project with enaio
The enaio costs of an ECM project consist of six building blocks: licences, implementation and consulting, interfaces, hosting or operation, training and maintenance, and their level depends on the number of users, the modules, process depth and system landscape.
For this reason there is no flat figure, but there is a clear method that lets you see the costs in full before the project starts. AWP Consult has been a certified enaio partner since 2006 and sets out all building blocks separately in every cost estimate, both one-off and recurring. Here you will learn what sits behind each building block, what drives it and how you arrive at a reliable quote.
- Licencesone-offrecurring
- Implementation and consultingone-off
- Interfacesone-off
- Hosting or operationrecurring
- Trainingone-off
- Maintenance and supportrecurring
The key points at a glance
- The enaio costs are the sum of all one-off and recurring expenses of an ECM project with enaio: licences, implementation and consulting, interfaces, data migration, hosting or operation, training and maintenance and support.
- The licence is only one part of this. Its scope is determined by the licensing model (purchase with a maintenance contract or rental model), the user model (named user or concurrent user) and the chosen modules.
- Implementation varies the most, because it depends on process depth, the number of sites and the depth of the ERP integration. Interfaces and training are separate items, not incidental costs.
- For a fair decision, the overall view across several years matters, the total cost of ownership. For this AWP Consult compares purchase with in-house operation against rental with cloud hosting over five years.
- A reliable quote comes from a volume framework of users, document types, volume, interfaces and legacy data. Clearly scoped entry projects at AWP Consult typically go live after 8 to 16 weeks.
- For AWP Consult clients the implementation pays for itself on average after 12 to 18 months, measured across more than 40 companies.
Sounds like a fit for your company? Let us talk about it.
What is included in the enaio costs?
The enaio costs include all expenses from the first analysis through to ongoing operation: the licences for enaio and its modules, the implementation with consulting and configuration, interfaces to ERP and line-of-business systems, hosting or operation, the training of users and maintenance with updates and support. Anyone who looks only at the licence therefore sees only one part of the picture.
This page places the costs of an ECM project with enaio as a whole. How the licensing models work in detail is explained on the page about the enaio licence, and the course of a project is described by enaio implementation.
Licences
Right to use enaio and the modules you deploy, such as enaio capture, enaio classify, enaio webclient or the AI module enaio kairos. Purchased with a maintenance contract or rented for a recurring fee.
Implementation and consulting
Analysis, functional concept, file structure, permissions, workflows, configuration, testing and support at go-live. The building block that depends most on your processes.
Interfaces
Connection to ERP, financial accounting, email, scanning and line-of-business applications, from simple document handover to integration in both directions with master data synchronisation.
Hosting or operation
Your own servers in your data centre or cloud hosting through AWP Consult in German data centres. This includes infrastructure, data backup, monitoring and the installation of updates.
Training
Training for key users, users and administration, tailored to your file structure and your workflows rather than to a generic demonstration.
Maintenance and support
Updates, manufacturer support, version changes and support during operation. With a purchase this is governed by an annual maintenance contract, and in the rental model the quote sets out what the recurring fee covers.
A seventh item is often forgotten: the data migration from network drives, legacy systems or paper archives. It depends on the scope and condition of your legacy data and is therefore defined as early as the analysis, not only during the project.
In the initial meeting we record the number of users, processes, interfaces and legacy data and assess which building blocks apply to you and to what extent.
Which cost building blocks does an ECM project with enaio have?
An ECM project with enaio has one-off cost building blocks that arise up to go-live, and recurring ones that return throughout the entire period of use. How extensive each building block turns out to be depends in each case on a few, clearly identifiable drivers, most of which you control yourself. The table shows the costs of an ECM project at a glance, without amounts but with what determines them.
| Building block | Type | What determines the scope | What you can control |
|---|---|---|---|
| Licences | one-off with purchase, recurring with rental | Number of users, named or concurrent user, chosen modules | Derive the need from roles, add modules in stages |
| Implementation and consulting | one-off | Number of processes, document types, sites and special cases | Start with one scoped process, decide quickly internally |
| Interfaces | one-off, maintenance recurring | Number of systems, direction and depth of the integration | Use standard connectors, set data ownership per system |
| Data migration | one-off | Quantity, quality and structure of the legacy data | Review legacy data in advance, clarify retention periods and deletion |
| Hosting or operation | recurring | Operating model, availability, storage, data backup | Choose the operating model according to internal IT capacity |
| Training | one-off, recurring for new employees | Number of roles and users, key user concept | Train key users who pass on knowledge internally |
| Maintenance and support | recurring | Licence scope, service level, support model | Choose support to match the importance of the system |
Internal effort for project management, departments and IT belongs in every honest calculation.
What drives the enaio costs up or down?
The enaio costs rise above all with the number of users and modules, the depth of the ERP integration, the quantity of legacy data and the number of parallel processes at the start. They fall when requirements are settled early, standard functions are used and procedures are simplified before configuration. Each of the six building blocks has its own drivers.
We go through the drivers with you and show where a lean start is possible without blocking the later expansion.
Request a cost estimate +49 6104 94738-1301
Licences and modules
With the licences, three questions decide the matter: how many people work with enaio, how simultaneously do they work, and which modules do they really need? The user model follows from the first two questions. For shift operations, as are common in logistics and production, a model with concurrent access is often more economical than one licence per person.
With the modules the rule is: not everything has to be licensed at the start. enaio capture for scanning and capture, enaio classify for classification, enaio webclient for browser access and enaio kairos for AI-supported recognition can be added in stages. enaio kairos extends the licence scope but reduces the manual capture effort. Whether the module is worthwhile for your document volume therefore belongs in the cost estimate. Purchase, rental and user models are explained in detail on the page enaio licensing models.
- Number of users derived from roles and working time models, not from the staff list
- Concurrency decides between named user and concurrent user
- Modules planned in expansion stages, not licensed in reserve
For the concurrent model do not count heads, but the highest number of simultaneous logins at peak times, for example at a shift change or during the month-end close.
02
Implementation, consulting and data migration
The implementation costs depend less on enaio than on your organisation: how many document types are there, how differently do the sites work, how many special cases does a process have, and how quickly are decisions made? Analysis, functional concept, filing plan, permissions concept, configuration of the workflows, testing and support at go-live form the core. Anyone who needs guidance before the system decision will find it in the enterprise content management consulting.
Data migration is a driver in its own right. A structured set of data from a previous DMS can be migrated differently from a network drive that has grown over time or a paper archive that first has to be scanned. Anyone who wants to destroy paper originals afterwards needs a documented scanning procedure, for example in accordance with Technical Guideline BSI TR-03138 (TR-RESISCAN). How legacy data moves cleanly is described on the page about migration to enaio.
- A scoped starting process keeps the concept and tests manageable.
- Fixed points of contact in the department shorten coordination loops.
- Review the legacy data in advance: what has to be migrated, what may be deleted?
Before migration, clarify which legacy data is still subject to retention periods under § 147 Abgabenordnung (AO). Anything no longer subject to a period and not needed for business purposes does not have to be migrated.
03
Interfaces and integration depth
Interfaces are often underestimated because they appear self-evident in a presentation. A simple document handover to DATEV is something different from a real-time connection to SAP with master data synchronisation, posting handover and status feedback. AWP Consult connects enaio to SAP via RFC and BAPI, as well as to DATEV, Microsoft Dynamics 365, Business Central and NAV, proALPHA, Sage, Diamant Software, eGECKO and Unit4.
In logistics a transport management system (TMS) is often added. The effort is determined by the number of connected systems, the direction of the data flow, the question of which system is authoritative for which data, and the depth of testing. How the connections look technically is shown on the page about enaio interfaces.
- Document handoverDocument and index data in one direction
- Master data synchronisationCreditors, cost centres or personnel data from the ERP
- In both directionsPosting, status and feedback between the systems
Before the quote, define which system is authoritative for which data. Unclear data ownership otherwise leads to variations during the project.
04
Hosting or in-house operation
In your own data centre you run enaio on your own servers. In that case servers or virtual machines, database, storage, data backup, monitoring and your IT team's working time for updates and incidents are part of the costs. With cloud hosting through AWP Consult in German data centres these become predictable recurring costs, and internal IT capacity is freed up.
In the cloud, contractual matters are added: processing personal data on behalf of a controller requires a contract under Art. 28 General Data Protection Regulation (GDPR). A benchmark for assessing cloud services is provided by the C5 criteria catalogue of the Federal Office for Information Security (BSI). More on this under enaio cloud hosting and cloud or on-premises.
With in-house operation, honestly factor in the internal working time for updates, data backup and incidents. Without your own server administration the cloud is often the more economical choice.
05
Training and acceptance
Training is not an incidental item but decides whether the licences are actually used later. A key user concept has proven itself: selected people per area are trained intensively, support the go-live and pass their knowledge on internally. Users learn their specific procedures, and administration learns permissions, file structure and operation.
Where a works council exists, the coordination belongs in the planning. Under § 87 Abs. 1 Nr. 6 Betriebsverfassungsgesetz (BetrVG) it has a right of co-determination over technical equipment intended to monitor the behaviour or performance of employees. For workflows with logging, early coordination is therefore advisable. The training courses from AWP Consult can be found under enaio training.
- Key users trained intensively, before go-live
- Users briefly and on their own processes
- AdministrationPermissions, file structure and operation
06
Maintenance, updates and support
After go-live, costs continue. With purchased licences the maintenance contract secures updates, patches and manufacturer support. Added to this are version changes, which with in-house operation have to be planned and tested, and further development when new processes are added.
How much support you need depends on how important enaio is for your day-to-day business. AWP Consult offers support and full-service support, accompanies updates and version changes and is available Monday to Friday from 08:30 to 17:00.
Plan an annual budget for further development. New document types or an additional workflow are often added after the first year of operation.
Which enaio licensing models are there and how do they affect the costs?
For enaio there are two fundamental licensing models, purchase with an annual maintenance contract and the rental model with a recurring fee, each combined with named user or concurrent user licences. Both distribute the costs differently over time but do not automatically lead to a lower overall total. Here only the overview, with the in-depth detail on the page about the enaio licence.
For tax purposes, the following applies to a purchase: under the BMF letter of 22 February 2022, a useful life of one year may be assumed for operating and application software, explicitly including ERP software. Whether this applies to your licences is a matter for your tax adviser.
Initial investment, then annual maintenance.
Recurring fee without an initial investment.
One licence per named person.
A pool for simultaneous access.
How do you compare enaio costs over five years?
You compare enaio costs over five years by placing all one-off and recurring building blocks side by side year by year, that is licence, implementation, interfaces, operation, maintenance and internal effort, and doing so separately for each realistic scenario. This overall view is called total cost of ownership (TCO). It prevents a cheap start from concealing expensive later years.
For this AWP Consult usually calculates two scenarios: purchase with in-house operation and rental with cloud hosting. The table shows where the items arise in both scenarios.
| Item | Purchase, in-house operation | Rental, cloud hosting |
|---|---|---|
| Licences | one-off in the first year | recurring in each year |
| Maintenance and updates | annual maintenance contract, installation by your IT team | scope as per quote and hosting contract |
| Infrastructure | Server, storage, database and data backup in-house | part of the hosting in German data centres |
| Internal operation | IT team's working time for operation, updates and incidents | lower, an internal point of contact is still needed |
| Implementation, interfaces, training | one-off, comparable in both scenarios | one-off, comparable in both scenarios |
| Progression over the years | Initial investment, then even follow-up costs | spread evenly over the term |
A comparison is only as good as its assumptions. Set the number of users, the term and the internal hourly rates the same for both scenarios.
We calculate purchase with in-house operation and rental with cloud hosting on the basis of your volume framework, with all one-off and recurring items.
- All building blocks shown separately
- One-off and recurring items
- Basis for your budget planning
How do you obtain a reliable quote for enaio?
You obtain a reliable quote for enaio when, before the calculation, the number of users, processes, document types, interfaces, legacy data and operating model are clarified. AWP Consult records these details in an initial meeting and a short process review and uses them to produce a non-binding cost estimate with all building blocks. The more precise the volume framework, the fewer assumptions are built into the quote.
01
Initial meeting
In around 45 minutes we clarify the starting position, the goals and the process you would like to start with. You receive a first assessment of which building blocks are relevant for you.
02
Record the volume framework
Users and roles, document types, volume per month, sites and legacy data. The DMS implementation checklist helps to gather these details in advance.
03
Clarify processes and interfaces
Which procedures are to run digitally, which systems are involved, and which system is authoritative for which data? From this the effort for configuration and integration is derived.
04
Define the operating model
In-house operation or cloud hosting, purchase or rental. On request we calculate both scenarios over five years.
05
Cost estimate with all building blocks
You receive a non-binding estimate with licences, implementation, interfaces, data migration, training, operation and maintenance, each split into one-off and recurring.
06
Quote or entry package
For a clearly scoped start there are fixed entry packages. We plan larger projects in phases, each of which ends with an approved result.
Would you like to record your volume framework together with us? The initial meeting creates the basis for a reliable cost estimate.
Arrange an initial meetingWhich details does a cost estimate for enaio require?
You should gather these details before the meeting. Not everything has to be exact, estimated values are enough for a first assessment. Whatever is missing we clarify together.
01
Users and organisation
- Number of people who are to work with enaio, by role
- Working time models and shift operation
- Sites and companies
- Points of contact in the department and IT
- Involvement of the works council and data protection
02
Documents and processes
- Document types and monthly volume
- Process for the start, for example the incoming invoice workflow or the digital personnel file
- Approval paths and special cases
- Legacy data: scope, storage location and format
- Retention periods and deletion rules
03
Systems and operation
- ERP and financial accounting system with version
- further line-of-business systems, email and scanners
- preferred operating model: own servers or cloud
- Requirements for availability and data backup
- preferred licensing model, if already known
We show you how this looks with enaio at your company.
When do the enaio costs pay off?
The enaio costs pay off as soon as the saved working time for searching, capturing, forwarding and filing, the early payment discounts taken, the eliminated paper and archive costs and the reduced effort during audits exceed the one-off and recurring costs. For AWP Consult clients this is the case on average after 12 to 18 months, measured across more than 40 companies. It happens fastest where many similar documents run through fixed procedures.
The tax audit also plays a part in this: under § 147 Abs. 6 AO the tax authorities may demand access to stored data and its machine evaluation, and the company bears the costs for this. An orderly, searchable archive keeps this effort small.
A first calculation of your own is provided by the payback calculator for the enaio implementation, and the DMS cost calculator additionally helps to place DMS costs. The calculation becomes reliable with your own volumes, which we record together in the initial meeting.
Full text and metadata instead of folders and mailboxes.
Read out documents instead of retyping them, with enaio classify and enaio kairos.
Approvals run digitally, early payment discount periods are met.
Paper archive and storage space are reduced step by step.
Data access for the tax audit without search effort.
Cases remain visible for those providing cover.
Which mistakes distort cost planning for enaio?
Cost planning for enaio is usually distorted when only part of the building blocks is considered, or only the first year. These six mistakes can be avoided before the quote.
| Typical mistake | Consequence | Better approach |
|---|---|---|
| Comparing only the licence | The cheapest licence offer leads to variations in implementation and interfaces. | Request and compare all building blocks separately and in full. |
| Forgetting data migration | The legacy data only appears during the project and blows the timeline and budget. | Review legacy data in the analysis and define the scope in advance. |
| Setting interfaces as a flat figure | A flat figure does not match the actual integration depth. | Describe data flow, direction and the authoritative system per interface. |
| Hiding internal effort | Departments and IT are overloaded, decisions are delayed. | Plan internal roles and time shares into the project plan. |
| Licensing in reserve | Unused licences and modules cause recurring maintenance without benefit. | Start with the need of the first expansion stage and add in a targeted way. |
| Considering only the first year | A cheap start conceals higher follow-up costs. | Compare purchase and rental over five years as total cost of ownership. |
When do which costs arise in an enaio project?
In an enaio project the one-off costs arise in the phases of analysis, concept, implementation and training and go-live, while the recurring costs begin with productive operation. A clearly scoped entry project at AWP Consult typically goes live after 8 to 16 weeks. Each phase ends with an approved result, so that you can control costs and progress step by step.
01
Analysis
Process review, volume framework, goals and key figures. The basis for the complete cost estimate before signing the contract.
02
Concept
File structure, permissions, workflows, interfaces and data migration are defined and approved by you.
03
Implementation
Configuration, interfaces, migration of the legacy data and tests with real documents.
04
Training and go-live
Key users and users are trained, and the start is supported. The recurring costs begin here.
05
Operation and expansion
Maintenance, support, hosting or in-house operation as well as further processes on the same platform.
More on this: enaio implementation and enaio consulting
How long does this take at your company? We estimate it together with you.
Request an estimate +49 6104 94738-13Which terms around the enaio costs should you know?
The most important terms that come up again and again in conversations about licences, quotes and operation.
01
Total cost of ownership
Total costs of a system over its period of use, including one-off, recurring and internal costs. The basis for a fair comparison of purchase and rental.
02
Named user
Licence assigned to a specific person. Useful for fixed workstations with regular use.
03
Concurrent user
Licence pool for simultaneous access. Several people share the licences, as long as not all are logged in at the same time.
04
Rental model
Use of the software for a recurring fee without an initial investment in licences.
05
Volume framework
Compilation of users, document types, volume, sites and legacy data. The basis of every reliable calculation.
06
Data migration
Transfer of documents and metadata from network drives, legacy systems or scanned paper archives into enaio.
07
Integration depth
Scope of an interface, from simple document handover to synchronisation in both directions with status feedback.
08
Processing onbehalf
Processing of personal data by a service provider on behalf of a controller, for example with cloud hosting. Requires a contract under Art. 28 GDPR.
A clearly outlined start keeps the first costs manageable and provides key figures for the further expansion on the same platform.
Sources and legal bases
The legal and tax statements on this page are based on these official and established sources. They do not replace tax or legal advice. As at October 2026.
- § 147 AO: Rules on the retention of records Retention periods and data access during external audits under para. 6
- BMF letter of 22/02/2022 on the useful life of hardware and software One-year useful life for operating and application software, provided by the IHK
- Art. 28 GDPR: Processor Contractual obligations when hosting personal data
- § 87 BetrVG: Co-determination rights Co-determination over technical equipment under para. 1 no. 6
- C5 criteria catalogue of the BSI Criteria for assessing the security of cloud services
Frequently asked questions about enaio costs
Your question about the costs is not here? Call us or write to us, and we will answer personally.
We assess your project and tell you which building blocks apply to you.
Arrange an initial meeting +49 6104 94738-13What does enaio cost?
A sound figure for enaio only emerges once the number of users, modules, processes, interfaces, legacy data and operating model are settled. enaio ranges from small teams with simple filing to companies with many sites, SAP connection and AI-supported capture. AWP Consult therefore produces a project-specific, non-binding cost estimate with all building blocks for every enquiry. The basis is an initial meeting via contact.
What do the enaio costs depend on?
The decisive factors are the number of users and the user model, the licensing model, the chosen modules, the number of processes and sites, the depth of the ERP integration, the scope of the legacy data and the operating model. Added to this are the training scope and the desired support during operation. You can control most of these drivers yourself through a clearly scoped start.
Why does AWP Consult not name a flat enaio price?
Because a single figure would not do justice to any project. Two companies with the same number of users can have very different levels of effort, for example through SAP integration, several sites or a large paper archive. A figure without a volume framework would be an estimate that would have to be corrected later. Instead we set out all building blocks in full after a short review.
Which enaio licensing models are there?
The licence can be purchased and supplemented with an annual maintenance contract, or used in the rental model for a recurring fee. In addition you choose between named user and concurrent user. The differences in detail are explained on the page about the enaio licence.
Which recurring enaio costs arise after go-live?
With purchased licences the maintenance contract with manufacturer support, updates and patches applies. In the rental model the recurring licence fee is added, with cloud hosting the hosting fee, and with in-house operation infrastructure and internal IT time. Support and further development are added optionally. AWP Consult sets out all recurring items in the quote, so that you can plan several years cleanly.
Are there hidden costs in an enaio project?
At AWP Consult all building blocks are set out in the quote: licences, implementation, interfaces, data migration, training, operation and maintenance. Experience shows that data migration, the depth of interfaces and the internal effort of departments and IT are underestimated. We therefore clarify these points in the analysis, before the quote is produced.
Is cloud hosting more expensive than in-house operation?
This cannot be answered across the board. In the cloud, investments in your own servers are eliminated, but a recurring hosting fee applies. In-house operation ties up capital and internal IT capacity for operation, updates and data backup. Without your own server administration the cloud is often the more economical choice, which is why AWP Consult calculates both options over five years.
What does implementing a digital incoming invoice workflow cost?
This depends on the invoice volume, the number of companies, approval stages and ERP connection. A simple handover to DATEV requires less effort than an integration with SAP including order matching. Typical building blocks are capture modules, workflow configuration, interface and training. How the process looks is shown on the page about the incoming invoice workflow.
How long does an enaio project take?
Clearly scoped entry projects at AWP Consult typically go live after 8 to 16 weeks. We plan extensive projects with several sites and SAP integration in phases. Each phase ends with an approved result, so that effort and progress remain visible at all times.
When does enaio pay off?
For AWP Consult clients the implementation pays for itself on average after 12 to 18 months, measured across more than 40 companies. It is particularly fast with a high document volume, previously unused early payment discounts and a lot of search effort. With the payback calculator you can make a first calculation of your own.
How do I obtain a cost estimate for enaio?
Arrange an initial meeting. In it we record the number of users, modules, processes, interfaces and data holdings. From this a non-binding cost estimate with all building blocks is produced, split into one-off and recurring. We respond to enquiries within one working day.
Can I start small and expand later?
Yes, that is in fact the recommended path. You begin with a clearly scoped process, for example incoming invoices, measure the benefit and then expand with further processes, modules or sites. Licences and modules can be added without rebuilding the existing configuration. For the start there are fixed entry packages.
Related topics
Your enaio costs, in full at a glance
In the initial meeting we record your volume framework and produce a non-binding cost estimate with all building blocks, split into one-off and recurring. In this way you decide on a reliable basis.
- In person in Dietzenbach or online
- All building blocks shown separately
- Non-binding, response within one working day